What does the installation of mechanical and electrical equi
‌‌Strong Electrical System‌: Involves the installation of power equipment (such as transformers, switchgear, cables) and lighting equipment ( Fixtures, switches, sockets).‌‌ 
What are the sub-items and sub-sections of the production li
The division of sub-projects for the installation of the production line usually includes the core parts such as the raw material preparation system, heating system, rolling system, finishing system, and auxiliary systems, as detailed below 
Installation specifications for electrical pipelines
It is forbidden to weld supports on load-bearing steel structures, and no hot processing should be carried out for drilling holes‌ 
Installation specifications for air conditioning equipment
Wall load-bearing‌: Lightweight walls need reinforcement, and old buildings must be fixed with expansion bolts‌  
What are the commonly used machinery and equipment for steel
‌Tower cranes‌: such as QT-2 type, QT1-6 type, etc., suitable for steel structure hoisting in high-rise buildings. ‌Caterpillar cranes‌: such as W1-50 type, W1-100 type, suitable for hoisting of large, heavy components. 
Equipment transportation and hoisting plan
Below is a transportation and hoisting scheme for steel structure installation equipment, covering transportation, hoisting preparation, implementation points, and safety measures, suitable for medium and large steel structure projects 
自定内容
Suzhou Lijian Mechanical and ELectrical Co.,Ltd
脚注信息

E - Mail: lijianjidian.2007@163.com
Website:www.lijianjidian.com
Company Address: Building 28, No. 369, Lushan Road, Suzhou High-tech Zone




自定内容
自定内容
18501536498
Copyright © All rights reserved by Suzhou Lijian
0512-69203678
自定内容
Website QR code
自定内容