What does the installation of mechanical and electrical equiStrong Electrical System: Involves the installation of power equipment (such as transformers, switchgear, cables) and lighting equipment ( Fixtures, switches, sockets).
-
What are the sub-items and sub-sections of the production liThe division of sub-projects for the installation of the production line usually includes the core parts such as the raw material preparation system, heating system, rolling system, finishing system, and auxiliary systems, as detailed below
-
Installation specifications for electrical pipelinesIt is forbidden to weld supports on load-bearing steel structures, and no hot processing should be carried out for drilling holes
-
Installation specifications for air conditioning equipmentWall load-bearing: Lightweight walls need reinforcement, and old buildings must be fixed with expansion bolts
-
What are the commonly used machinery and equipment for steelTower cranes: such as QT-2 type, QT1-6 type, etc., suitable for steel structure hoisting in high-rise buildings. Caterpillar cranes: such as W1-50 type, W1-100 type, suitable for hoisting of large, heavy components.
-
Equipment transportation and hoisting planBelow is a transportation and hoisting scheme for steel structure installation equipment, covering transportation, hoisting preparation, implementation points, and safety measures, suitable for medium and large steel structure projects